Electricity Forum Intelligent Power Today Magazine Arc Flash Clothing

Breaker Testing


Power Factor Testing of Circuit Breakers

Detecting contamination and deterioration in SF6 breakers to ensure longevity BY LINDA NOWAK, Doble Engineering Company The purpose of “Doble testing”, or power factor testing, SF6 (sulfur hexafluoride) circuit breakers is to detect the presence of contamination and/or deterioration of the...

Smart Substations and Their Role in the Evolving Smart Grid

A Smart substation digitizes protection and control, enabling utilities to detect faults faster, manage DER volatility, and reduce outage risk. The payoff depends on architecture, cybersecurity, and edge analytics, not just new relays. The shift toward smart substations is inseparable from broader...

Substation Testing


Digital Twins for Substations: Bridging the Physical and Digital Worlds

In the rapidly evolving landscape of power grid management, digital twin technology is emerging as a game-changer for substations. By creating virtual replicas of physical assets, digital twins bridge the gap between the physical and digital worlds, enabling enhanced operational efficiency and...

CONDITION MONITORING IN AN AGE OF MODERNIZATION How (and Why) to Adapt

The widespread application and use of electricity, which may now seem like a simple commodity, is considered one of the greatest technical developments of all time. However, keeping up with today’s demand for power is anything but simple: a vast amount of resources goes into maintaining a...

Cable Testing


Solving Underground Cable Problems with Partial Discharge Testing

How to prevent failure with partial discharge testing BY HENNING OETJEN, Megger Partial discharge (PD) measurements are increasingly used as a reliable and non-destructive diagnostic method to detect weak spots in the insulation of underground cables. Routinely, partial discharge measurements are...

HV Test Equipment

The End of the Road for Transmission Incentives

In a significant shift, the Federal Energy Regulatory Commission (FERC) has decided to abandon its transmission incentives policy, particularly the construction work in progress (CWIP) incentives. This decision marks a pivotal change in how transmission projects are financed and regulated, potentially impacting stakeholders across the energy sector.

Historically, transmission incentives, including CWIP, were designed to encourage investment in the nation's aging and overburdened transmission infrastructure. By allowing utilities to recover costs during the construction phase,...

HV Test Equipment Articles