Electricity Forum Intelligent Power Today Magazine Arc Flash Clothing

Cable Testing



Solving Underground Cable Problems with Partial Discharge Testing

How to prevent failure with partial discharge testing BY HENNING OETJEN, Megger Partial discharge (PD) measurements are increasingly used as a reliable and non-destructive diagnostic method to detect weak spots in the insulation of underground cables. Routinely, partial discharge measurements are...

Transformer Testing


New York's Path to 8.5 GW of Grid Flexibility by 2040

New York State's transition to a clean, zero-emissions energy grid could include up to 8.5 gigawatts (GW) of grid flexibility by 2040, according to a new report from the Brattle Group. This projection, while contingent on achieving ambitious decarbonization goals, illustrates how the state could...

Pennsylvania’s Yaw Bill

In a significant move for Pennsylvania’s energy sector, State Senator Gene Yaw has introduced a transformative piece of legislation aimed at modernizing the state's approach to power plant development and capacity management. The bill, which has been the subject of considerable discussion,...

Breaker Testing


Circuit Breaker Lubrication

Developing circuit breaker lubrication procedures BY RICK YOUNGBLOOD, Doble Engineering Company Circuit breaker analyzers are used to determine operating speeds and velocity. This information enables the tester to determine if a breaker is safe to place back into service. The data recorded by a...

Partial Discharge & Circuit Breaker Asset Management

Detecting and avoiding preventable failures BY JAY GARNETT, Doble Engineering Company While metal clad switchgear can be very reliable, sometimes operating for over 50 years, throughout the aging process, this group of electrical disconnect switches, fuses and circuit breakers can experience...

HV Test Equipment

IR Inspection Windows for Electrical System Reliability

An Infrared Inspection Window is used to separate environments of differing pressures or temperatures while allowing light energy at a specified electromagnetic wavelength to pass between the two environments. They must meet the strength and environmental requirements for the type of equipment in which they are fitted, as well as be compatible with the infrared inspection equipment being used.

IR Inspection Windows enable the following:

  • Collection of real-time, condition status data on critical electrical systems...

HV Test Equipment Articles