Electrical Substations Featured Fleet Management Growth & Innovation HV Test Equipment Industry News & Trends Lineman Safety MARKETPLACE Overhead T&D Power Transformers Renewable Energy Smart Grid Smart Metering Software and Apps State of Industry T&D Automation T&D Companies T&D Products White Papers

Case Study


High-Capacity, Energy-Efficient ACCC® Conductor Case Study

This project won EEI Transmission Project of the Year – 2016 Description: 240 circuit miles, 345 kV line, double bundleProject: Replace 1,440 miles of ACSR conductor with ACCC   Objectives Improve reliability (reduced sag and corrosion) Increased capacity to serve growth (2X...

Case Study: Rapid Changes in Bushing Health

IntroductionContinuous online monitoring of bushings provides real-time information which can result in the early detection of a possible failure. Challenge: A Major AlarmA prominent U.S. utility was looking for a way to improve system reliability for their 138kV assets. They researched and...

EFACEC case study

The EFACEC Group is leading the supply of integrated solutions and equipment in the market of power generation, transmission and distribution. The Group forms a complete value chain, from building turnkey projects to equipment manufacture, where integrated solutions are developed and designed in...

Case Study

magazine_jul_aug_2023_article_2

MAXCELL® CASE STUDY

OPPORTUNITY
A proposal for equipping broadband services to the Fort Collins, CO, municipality was approved by residents and a $120 million bond is now providing Fort Collins with resources to build and improve the municipality’s infrastructure so it can support broadband service for any qualifying resident. Fort Collins distributes power to its community, so building broadband services through existing right-of- way infrastructure was a viable way to provide competitively priced services to residents.
After a...

Related Articles


simulation software

EFACEC case study

The EFACEC Group is leading the supply of integrated solutions and equipment in the market of power generation, transmission and distribution. The Group forms a complete value chain, from building turnkey projects to equipment manufacture, where integrated solutions are developed and designed in...

I Need To Hire a Utility Contractor. Where Do I Start?

In June 2012, the Ontario Legislature unanimously passed Bill 8, the Ontario Underground Infrastructure Notification System Act, which, among other things, requires owners of buried infrastructure in the public right of way – including municipalities, universities, hospitals and private...


magazine_jul_aug_2023_article_2

MAXCELL® CASE STUDY

OPPORTUNITYA proposal for equipping broadband services to the Fort Collins, CO, municipality was approved by residents and a $120 million bond is now providing Fort Collins with resources to build and improve the municipality’s infrastructure so it can support broadband service for any...

magazine_may_june_2023_article_1

Case Study: Rapid Changes in Bushing Health

IntroductionContinuous online monitoring of bushings provides real-time information which can result in the early detection of a possible failure. Challenge: A Major AlarmA prominent U.S. utility was looking for a way to improve system reliability for their 138kV assets. They researched and...

High-Capacity, Energy-Efficient ACCC® Conductor Case Study

This project won EEI Transmission Project of the Year – 2016 Description: 240 circuit miles, 345 kV line, double bundleProject: Replace 1,440 miles of ACSR conductor with ACCC   Objectives Improve reliability (reduced sag and corrosion) Increased capacity to serve growth (2X...

simulation software

EFACEC case study

The EFACEC Group is leading the supply of integrated solutions and equipment in the market of power generation, transmission and distribution. The Group forms a complete value chain, from building turnkey projects to equipment manufacture, where integrated solutions are developed and designed in...

I Need To Hire a Utility Contractor. Where Do I Start?

In June 2012, the Ontario Legislature unanimously passed Bill 8, the Ontario Underground Infrastructure Notification System Act, which, among other things, requires owners of buried infrastructure in the public right of way – including municipalities, universities, hospitals and private...

Page 1 of 1