Electricity Forum Intelligent Power Today Magazine Arc Flash Clothing

Breaker Testing


Partial Discharge & Circuit Breaker Asset Management

Detecting and avoiding preventable failures BY JAY GARNETT, Doble Engineering Company While metal clad switchgear can be very reliable, sometimes operating for over 50 years, throughout the aging process, this group of electrical disconnect switches, fuses and circuit breakers can experience...

Smart Substations and Their Role in the Evolving Smart Grid

A Smart substation digitizes protection and control, enabling utilities to detect faults faster, manage DER volatility, and reduce outage risk. The payoff depends on architecture, cybersecurity, and edge analytics, not just new relays. The shift toward smart substations is inseparable from broader...

Substation Testing


Digital Twins for Substations: Bridging the Physical and Digital Worlds

In the rapidly evolving landscape of power grid management, digital twin technology is emerging as a game-changer for substations. By creating virtual replicas of physical assets, digital twins bridge the gap between the physical and digital worlds, enabling enhanced operational efficiency and...

CONDITION MONITORING IN AN AGE OF MODERNIZATION How (and Why) to Adapt

The widespread application and use of electricity, which may now seem like a simple commodity, is considered one of the greatest technical developments of all time. However, keeping up with today’s demand for power is anything but simple: a vast amount of resources goes into maintaining a...

Cable Testing



Solving Underground Cable Problems with Partial Discharge Testing

How to prevent failure with partial discharge testing BY HENNING OETJEN, Megger Partial discharge (PD) measurements are increasingly used as a reliable and non-destructive diagnostic method to detect weak spots in the insulation of underground cables. Routinely, partial discharge measurements are...

HV Test Equipment

MRVI

Safe Work Verified Through Data Logging Technology

On Distribution, Transmission or Substation equipment, testing for presence or absence of nominal voltage is mandated specifically by OSHA rule 1910.269(n)(5) which states “Testing. The employer shall ensure that, unless a previously installed ground is present, employees test lines and equipment and verify the absence of nominal voltage before employees install any ground on those lines or that equipment.”


The Bevins Company in Tulsa, Oklahoma has developed two new voltage indicators incorporating the latest technology...

HV Test Equipment Articles