Substation Testing


Digital Twins for Substations: Bridging the Physical and Digital Worlds

In the rapidly evolving landscape of power grid management, digital twin technology is emerging as a game-changer for substations. By creating virtual replicas of physical assets, digital twins bridge the gap between the physical and digital worlds, enabling enhanced operational efficiency and...

CONDITION MONITORING IN AN AGE OF MODERNIZATION How (and Why) to Adapt

The widespread application and use of electricity, which may now seem like a simple commodity, is considered one of the greatest technical developments of all time. However, keeping up with today’s demand for power is anything but simple: a vast amount of resources goes into maintaining a...

Cable Testing


Solving Underground Cable Problems with Partial Discharge Testing

How to prevent failure with partial discharge testing BY HENNING OETJEN, Megger Partial discharge (PD) measurements are increasingly used as a reliable and non-destructive diagnostic method to detect weak spots in the insulation of underground cables. Routinely, partial discharge measurements are...

Breaker Testing


Power Factor Testing of Circuit Breakers

Detecting contamination and deterioration in SF6 breakers to ensure longevity BY LINDA NOWAK, Doble Engineering Company The purpose of “Doble testing”, or power factor testing, SF6 (sulfur hexafluoride) circuit breakers is to detect the presence of contamination and/or deterioration of the...

Circuit Breaker Lubrication

Developing circuit breaker lubrication procedures BY RICK YOUNGBLOOD, Doble Engineering Company Circuit breaker analyzers are used to determine operating speeds and velocity. This information enables the tester to determine if a breaker is safe to place back into service. The data recorded by a...

HV Test Equipment

ACCELERATING TOWARDS GREATER TESTING EFFICIENCY - A true transformer test van

Test lead management, including quality of connection and correct lead placement, is an important part of testing. Poor or incorrect connections can be the culprit for nonrepresentative results that ultimately lead to longer test times and, in some cases, wasteful investigations to diagnose transformer problems that do not exist.

The time required to perform electrical testing is mostly influenced by the time involved during test set-up and breakdown. Therefore improving test efficiency largely becomes a matter of improving lead management. Solutions are emerging...