Transformer Testing


Dielectric Voltage Testing – Standard Methods

There are two standard methods from ASTM International: D877, Standard Test Method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes, and D1816, Standard Test Method for Dielectric Breakdown Voltage of Insulating Oils of Petroleum Origin Using VDE Electrodes. VDE stands...

The End of the Road for Transmission Incentives

In a significant shift, the Federal Energy Regulatory Commission (FERC) has decided to abandon its transmission incentives policy, particularly the construction work in progress (CWIP) incentives. This decision marks a pivotal change in how transmission projects are financed and regulated,...

Cable Testing



Solving Underground Cable Problems with Partial Discharge Testing

How to prevent failure with partial discharge testing BY HENNING OETJEN, Megger Partial discharge (PD) measurements are increasingly used as a reliable and non-destructive diagnostic method to detect weak spots in the insulation of underground cables. Routinely, partial discharge measurements are...

Breaker Testing


Dynamic Resistance Measurement

Condition testing of circuit breaker’s arcing contacts BY BUDO MILOVIC, DV-Power The preventive maintenance on a high-voltage (HV) breaker consists of several routine tests. The timing and motion tests are methods used to assess the breaker’s mechanical condition. When the timing and motion...

Circuit Breaker Lubrication

Developing circuit breaker lubrication procedures BY RICK YOUNGBLOOD, Doble Engineering Company Circuit breaker analyzers are used to determine operating speeds and velocity. This information enables the tester to determine if a breaker is safe to place back into service. The data recorded by a...

HV Test Equipment

ACCELERATING TOWARDS GREATER TESTING EFFICIENCY - A true transformer test van

Test lead management, including quality of connection and correct lead placement, is an important part of testing. Poor or incorrect connections can be the culprit for nonrepresentative results that ultimately lead to longer test times and, in some cases, wasteful investigations to diagnose transformer problems that do not exist.

The time required to perform electrical testing is mostly influenced by the time involved during test set-up and breakdown. Therefore improving test efficiency largely becomes a matter of improving lead management. Solutions are emerging...

HV Test Equipment Articles