Electricity Forum Intelligent Power Today Magazine Arc Flash Clothing

Breaker Testing


Partial Discharge & Circuit Breaker Asset Management

Detecting and avoiding preventable failures BY JAY GARNETT, Doble Engineering Company While metal clad switchgear can be very reliable, sometimes operating for over 50 years, throughout the aging process, this group of electrical disconnect switches, fuses and circuit breakers can experience...

Circuit Breaker Time and Motion Testing

Determining mechanical condition of high-voltage circuit breakers BY JOZEF LEVI, Doble Engineering Company Life expectancy of a newly installed high-voltage circuit breaker is approximately 40 years. Throughout its life, under normal circuit conditions, the circuit breaker will operate less than...

Substation Testing


Digital Twins for Substations: Bridging the Physical and Digital Worlds

In the rapidly evolving landscape of power grid management, digital twin technology is emerging as a game-changer for substations. By creating virtual replicas of physical assets, digital twins bridge the gap between the physical and digital worlds, enabling enhanced operational efficiency and...

CONDITION MONITORING IN AN AGE OF MODERNIZATION How (and Why) to Adapt

The widespread application and use of electricity, which may now seem like a simple commodity, is considered one of the greatest technical developments of all time. However, keeping up with today’s demand for power is anything but simple: a vast amount of resources goes into maintaining a...

Transformer Testing


FERC Approves Interconnection for Talen Energy, Amazon Data Center

In a significant move that underscores the growing demand for reliable and sustainable energy to power the expanding digital infrastructure, the Federal Energy Regulatory Commission (FERC) has approved an interconnection agreement between Talen Energy, Amazon Web Services (AWS), and Exelon. This...

The End of the Road for Transmission Incentives

In a significant shift, the Federal Energy Regulatory Commission (FERC) has decided to abandon its transmission incentives policy, particularly the construction work in progress (CWIP) incentives. This decision marks a pivotal change in how transmission projects are financed and regulated,...

HV Test Equipment

Power Factor Testing of Circuit Breakers

Detecting contamination and deterioration in SF6 breakers to ensure longevity

BY LINDA NOWAK, Doble Engineering Company

The purpose of “Doble testing”, or power factor testing, SF6 (sulfur hexafluoride) circuit breakers is to detect the presence of contamination and/or deterioration of the breaker’s insulating system. This process will allow corrective actions to be taken to ensure the integrity of the breaker.

The Doble test is completed by measuring the insulation’s dielectric-loss and capacitance and...

HV Test Equipment Articles