Breaker Testing


Vacuum Interrupter Testing for Circuit Breakers

How to predict field life using vacuum interrupters BY FINLEY LEDBETTER, Group CBS Utilities have widely replaced older air-magnetic and oil interrupters for circuit breakers rated at one kilovolt (kV) or higher with vacuum interrupters (VI) due to higher interrupt capability. Vacuum interrupters...

Smart Substations and Their Role in the Evolving Smart Grid

The power industry is undergoing a profound transformation driven by grid modernization, renewable integration, and increasing demands for resilience and efficiency. At the heart of this evolution lies the smart substation—a next-generation facility equipped with advanced sensors, digital...

Cable Testing


Solving Underground Cable Problems with Partial Discharge Testing

How to prevent failure with partial discharge testing BY HENNING OETJEN, Megger Partial discharge (PD) measurements are increasingly used as a reliable and non-destructive diagnostic method to detect weak spots in the insulation of underground cables. Routinely, partial discharge measurements are...

Transformer Testing


Smart Transformers: Enhancing Grid Efficiency and Reliability

The evolving demands of modern power grids necessitate the adoption of advanced technologies that can provide enhanced efficiency, reliability, and flexibility. Smart transformers are at the forefront of this technological revolution, offering a range of capabilities that significantly improve the...

New York's Path to 8.5 GW of Grid Flexibility by 2040

New York State's transition to a clean, zero-emissions energy grid could include up to 8.5 gigawatts (GW) of grid flexibility by 2040, according to a new report from the Brattle Group. This projection, while contingent on achieving ambitious decarbonization goals, illustrates how the state could...

HV Test Equipment

ACCELERATING TOWARDS GREATER TESTING EFFICIENCY - A true transformer test van

Test lead management, including quality of connection and correct lead placement, is an important part of testing. Poor or incorrect connections can be the culprit for nonrepresentative results that ultimately lead to longer test times and, in some cases, wasteful investigations to diagnose transformer problems that do not exist.

The time required to perform electrical testing is mostly influenced by the time involved during test set-up and breakdown. Therefore improving test efficiency largely becomes a matter of improving lead management. Solutions are emerging...

HV Test Equipment Articles