Critter Guard Introduction

Distinctly Different According to the American Public Power Association, squirrels are among the top causes of power outages across the United States. The Great Lakes region has squirrels as the #1 cause of sustained outages. And in many cases, bird related outages are at number two.Nobody likes...


Optimal Transformer Efficiency Using Weighted Average

In order to improve the efficiency of electrical distribution in commercial buildings, the US Department of Energy (DOE) introduced regulations with more stringent minimums on transformer efficiencies in January 2016. This was covered under the Code of Federal Regulations 10 CFR Part 431.192 and...

The Problem with Birds in Substation Outages

Birds have been a problem for electrical substations since the first power distribution systems were built. The elevated components of substations create ideal perches and overhangs for birds to nest and find safety. Critical electrical substation design principles now include deterrent elements...

POWER TRANSFORMERS. Surplec Repair Facilities

Repairing & Remanufacturing your transformer offers a solution that is both technically and economically efficient. Through repairs, we restore a transformer to its original condition in all aspects (current, voltage and impedance). Remanufacturing, on the other hand, involves, e.g., providing...

Acutran Transformers: Built to Military Precision

Acutran is a veteran-owned custom designer and manufacturer of low- and medium-voltage dry-type transformers from 10VA to 3000kVA with voltages up to 25000V, inductors and reactors, and related components and services.The company was founded in 1983 and is now owned by Mike Evans, who is also the...

T&D Companies

transformer repair

Radiator Fin(s) Leak Repair

Radiator fins are notorious for leaking at various locations. One of which is where the fins are attached (welded) to the horizontal bottom-run header. Measurements are taken so a weir box can be installed to cover the fin(s) that are leaking. It is preferred the weir box will cover above the leaking area about 6".
This 6” cover will allow for urethane (poured into weir box) to adhere to the drier part of the fin(s) to assist with the sealing process. After pour, the technician will mark the outside of the weir box at the location(s) where the original leak was. This incase further work may be required for a better seal. After the urethane is poured and let to cure (usually overnight) the job is inspected to determined seal effectiveness. In the event we still have some leakage; whether the following day or later, an additional procedure may be performed. If leaking, the weir box is fabricated out of 11ga galvanized sheet metal which is thick enough for completing a 1/16" NPT. The technician will decide where (usually where it's been marked) and how many 1/16" D&T’s (drill & taps) are required. Once additional d&t's are completed, injection valves installed, then a special 2-part sealant (must be approved from a dielectric and DGA standpoint) will be injected. The thought is: now that there is cured urethane above the original leak(s) and we have marked the weir box for injecting close to that spot, we have created a bridging barrier for our sealant to back up against (so as not to extrude out the top of the weir box).