Cable Testing Comes of Age - One Cycle at a Time

Field Testing of MV and HV cables has come a long way in recent decades. Gone are the days of old, when the traditional DC (Direct Voltage/Current) hipot was the recommended method for testing these modern cables that form the critical backbone of the distribution electrical power network....

The Evolution / Revolution of Overhead Conductors… and why it matters

Brief Background: In the early 1900's Aluminum Conductor Steel Reinforced (ACSR) conductor was developed to replace copper wires, due to the war effort when copper was needed for munitions. In the 1970's growing demand for electricity inspired the development of higher capacity Aluminum Conductor...

Cable Cleats Testing - Crucial to Cable Management

Essentially, cable cleats are devices designed to secure cables and to ensure the retention and support of them, reducing the load that the cable may be exposed to under its own weight. They are also designed to contain the cables under fault conditions, protecting the cables and the cable...

Wire and Cable

FERC Complaint Targets Duke, PJM Transmission Planning

A coalition of large energy consumers and ratepayer advocates has filed a complaint with the Federal Energy Regulatory Commission (FERC), urging the agency to prohibit transmission owners from independently planning "local" transmission projects exceeding 100 kilovolts (kV). The coalition argues that such local planning, lacking independent oversight, leads to inefficient and costly transmission development, resulting in unjust and unreasonable rates for consumers.

Background

Transmission planning involves determining the necessary infrastructure to transport electricity from generation...

Related Articles


Cable Cleats Testing - Crucial to Cable Management

Essentially, cable cleats are devices designed to secure cables and to ensure the retention and support of them, reducing the load that the cable may be exposed to under its own weight. They are also designed to contain the cables under fault conditions, protecting the cables and the cable...

Copper Theft: A Call to Action

How utilities can stand firm to save money and save lives BY PHILL FELTHAM, Executive EditorElectricity Today Magazine Copper theft has become a growing problem for utilities in Canada and the United States. This precious metal has increased in value in recent years, so thieves are stripping...

FirstEnergy Explores Alternatives to PJM Capacity Market

In a strategic move aimed at enhancing its power supply reliability, FirstEnergy is actively exploring alternatives to the PJM capacity market. This development reflects the company’s proactive approach to addressing challenges within the existing market structure and ensuring a more robust...

High-Capacity, Energy-Efficient ACCC® Conductor Case Study

This project won EEI Transmission Project of the Year – 2016 Description: 240 circuit miles, 345 kV line, double bundleProject: Replace 1,440 miles of ACSR conductor with ACCC   Objectives Improve reliability (reduced sag and corrosion) Increased capacity to serve growth (2X...


FERC Complaint Targets Duke, PJM Transmission Planning

A coalition of large energy consumers and ratepayer advocates has filed a complaint with the Federal Energy Regulatory Commission (FERC), urging the agency to prohibit transmission owners from independently planning "local" transmission projects exceeding 100 kilovolts (kV). The coalition argues...

magazine_sep_oct_2023_article_2

FERC Approves Interconnection for Talen Energy, Amazon Data Center

In a significant move that underscores the growing demand for reliable and sustainable energy to power the expanding digital infrastructure, the Federal Energy Regulatory Commission (FERC) has approved an interconnection agreement between Talen Energy, Amazon Web Services (AWS), and Exelon. This...

FirstEnergy Explores Alternatives to PJM Capacity Market

In a strategic move aimed at enhancing its power supply reliability, FirstEnergy is actively exploring alternatives to the PJM capacity market. This development reflects the company’s proactive approach to addressing challenges within the existing market structure and ensuring a more robust...

Cable Cleats Testing - Crucial to Cable Management

Essentially, cable cleats are devices designed to secure cables and to ensure the retention and support of them, reducing the load that the cable may be exposed to under its own weight. They are also designed to contain the cables under fault conditions, protecting the cables and the cable...