Electricity Forum Intelligent Power Today Magazine Arc Flash Clothing

Wire and Cable



Copper Theft: A Call to Action

How utilities can stand firm to save money and save lives BY PHILL FELTHAM, Executive EditorElectricity Today Magazine Copper theft has become a growing problem for utilities in Canada and the United States. This precious metal has increased in value in recent years, so thieves are stripping copper...

High-Capacity, Energy-Efficient ACCC® Conductor Case Study

This project won EEI Transmission Project of the Year – 2016 Description: 240 circuit miles, 345 kV line, double bundleProject: Replace 1,440 miles of ACSR conductor with ACCC   Objectives Improve reliability (reduced sag and corrosion) Increased capacity to serve growth (2X...

Wire and Cable

ACS minimizes fire potential

United Power Installs Hendrix Aerial Spacer Cable Solution to Address Fire Mitigation Needs

Based in Brighton, CO, United Power Inc. is the 2nd largest electric cooperative in Colorado. With over 5,000 miles of power lines and nearly 83,000 meters, they serve over 200,000 customers along the north central range of the Colorado Rockies. A section of the United Power service area also heads up into the mountains, providing power to some 5,500 remote homes in and around the 12,000 acres of Golden Gate Canyon State Park.
Rugged terrain...

Related Articles


High-Capacity, Energy-Efficient ACCC® Conductor Case Study

This project won EEI Transmission Project of the Year – 2016 Description: 240 circuit miles, 345 kV line, double bundleProject: Replace 1,440 miles of ACSR conductor with ACCC   Objectives Improve reliability (reduced sag and corrosion) Increased capacity to serve growth (2X...

Power line conductor repair

How Modern Conductors are Improving Grid Reliability and Much More

Reflections: Nearly twenty years ago when I got into the energy business, reliability was a second-tier design objective for most transmission engineers. Safety factors had already been established and the materials we used for structures and powerline wires (conductors) were well known. While...


FERC Complaint Targets Duke, PJM Transmission Planning

A coalition of large energy consumers and ratepayer advocates has filed a complaint with the Federal Energy Regulatory Commission (FERC), urging the agency to prohibit transmission owners from independently planning "local" transmission projects exceeding 100 kilovolts (kV). The coalition argues...

magazine_sep_oct_2023_article_2

FERC Approves Interconnection for Talen Energy, Amazon Data Center

In a significant move that underscores the growing demand for reliable and sustainable energy to power the expanding digital infrastructure, the Federal Energy Regulatory Commission (FERC) has approved an interconnection agreement between Talen Energy, Amazon Web Services (AWS), and Exelon. This...

FirstEnergy Explores Alternatives to PJM Capacity Market

In a strategic move aimed at enhancing its power supply reliability, FirstEnergy is actively exploring alternatives to the PJM capacity market. This development reflects the company’s proactive approach to addressing challenges within the existing market structure and ensuring a more robust...

Cable Cleats Testing - Crucial to Cable Management

Essentially, cable cleats are devices designed to secure cables and to ensure the retention and support of them, reducing the load that the cable may be exposed to under its own weight. They are also designed to contain the cables under fault conditions, protecting the cables and the cable...

Page 1 of 3