OPPORTUNITY
A proposal for equipping broadband services to the Fort Collins, CO, municipality was approved by residents and a $120 million bond is now providing Fort Collins with resources to build and improve the municipality’s infrastructure so it can support broadband service for any qualifying resident. Fort Collins distributes power to its community, so building broadband services through existing right-of- way infrastructure was a viable way to provide competitively priced services to residents.
After a...
Related Articles
EFACEC case study
The EFACEC Group is leading the supply of integrated solutions and equipment in the market of power generation, transmission and distribution. The Group forms a complete value chain, from building turnkey projects to equipment manufacture, where integrated solutions are developed and designed in...
I Need To Hire a Utility Contractor. Where Do I Start?
In June 2012, the Ontario Legislature unanimously passed Bill 8, the Ontario Underground Infrastructure Notification System Act, which, among other things, requires owners of buried infrastructure in the public right of way – including municipalities, universities, hospitals and private...
United Power Installs Hendrix Aerial Spacer Cable Solution to Address Fire Mitigation Needs
Based in Brighton, CO, United Power Inc. is the 2nd largest electric cooperative in Colorado. With over 5,000 miles of power lines and nearly 83,000 meters, they serve over 200,000 customers along the north central range of the Colorado Rockies. A section of the United Power service area also heads...
MAXCELL® CASE STUDY
OPPORTUNITYA proposal for equipping broadband services to the Fort Collins, CO, municipality was approved by residents and a $120 million bond is now providing Fort Collins with resources to build and improve the municipality’s infrastructure so it can support broadband service for any...
Case Study: Rapid Changes in Bushing Health
IntroductionContinuous online monitoring of bushings provides real-time information which can result in the early detection of a possible failure. Challenge: A Major AlarmA prominent U.S. utility was looking for a way to improve system reliability for their 138kV assets. They researched and...
United Power Installs Hendrix Aerial Spacer Cable Solution to Address Fire Mitigation Needs
Based in Brighton, CO, United Power Inc. is the 2nd largest electric cooperative in Colorado. With over 5,000 miles of power lines and nearly 83,000 meters, they serve over 200,000 customers along the north central range of the Colorado Rockies. A section of the United Power service area also heads...
High-Capacity, Energy-Efficient ACCC® Conductor Case Study
This project won EEI Transmission Project of the Year – 2016 Description: 240 circuit miles, 345 kV line, double bundleProject: Replace 1,440 miles of ACSR conductor with ACCC Objectives Improve reliability (reduced sag and corrosion) Increased capacity to serve growth (2X...
EFACEC case study
The EFACEC Group is leading the supply of integrated solutions and equipment in the market of power generation, transmission and distribution. The Group forms a complete value chain, from building turnkey projects to equipment manufacture, where integrated solutions are developed and designed in...
I Need To Hire a Utility Contractor. Where Do I Start?
In June 2012, the Ontario Legislature unanimously passed Bill 8, the Ontario Underground Infrastructure Notification System Act, which, among other things, requires owners of buried infrastructure in the public right of way – including municipalities, universities, hospitals and private...