LATEST ISSUE  ARTICLES FFOM ALL ISSUES  ISSUE ARCHIVE  READER SERVICE INQUIRY  ADVERTISING RATES

  Our Site
  About Us/Staff
  Feedback
  Web Advertising Plans - CAN
  Web Advertising Plans - USA
   Training & Conferences
  Electricity Forum Training Institute(EFTI)
  Industry Conferences
   Directories
  T&D Companies
  T&D Products/Services
  Generation Companies
  Generation Products/Services
  Product Showcase
  Buy Products On-Line
  Features
  Electricity Today Magazine
  Electricity News
  Classifieds
  Careers
  Industry Links
  Bookstore
Update:
Our Latest Forum Schedule

FREE

Email
Newsletter

Monthly
Magazine

Member Of


Download
Our 
Issues

TRANSMISSION AND DISTRIBUTION

SwePol Link Sets New Environmental Standard for HVDC Transmission

By Leif Söderberg and Bernt Abrahamsson

Six cable links -- all of them HVDC (high-voltage direct current) -- are currently in service between the power grids of continental Europe and the Nordic region, with another five planned. The latest to be brought on line is the SwePol Link, which connects the electricity networks of Poland and Sweden. It is unique in that, unlike previous installations that depend on electrode stations to transmit the return current under ground or under water, it uses 20-kV XLPE cable to carry this current. The high-voltage HVDC submarine cable used for the SwePol Link is designed for 600 MW at 450 kV.

The reason for all these links is the vital need to secure power system reliability in each of the participating countries. They make it easier to optimize power generation in an area in which different countries use different means of power generation and have different power demand profiles over a 24-hour period. Wet summers in the Nordic region result in a considerable power surplus, which can be sold to countries that rely on more expensive fossil fuel-fired power plants. Conversely, any surplus power can be sold back during periods of low load.

Power system reliability in the region is increased by the addition of new HVDC cable links. In the event of grid disruptions, the rapid power balancing ability of these links can be used to compensate for fluctuations in frequency and voltage. For example, it is technically feasible to reverse the entire 600 MW power throughput of the SwePol Link in just 1.3 seconds, although this is not a feature that will be used in practice. Nevertheless, a typical emergency power measure could call for a DP ramp-up of 300 MW within a few seconds to prevent grid failure if the voltage in southern Sweden drops below 380 kV.

With all previous links of this kind, electrode stations off the coast transmit the return current under the sea, and this has worked perfectly well (Table 1). The first such cable link was laid in 1954 between Västervik, on the Swedish mainland, and the Baltic island of Gotland. Since then, the power rating has been increased and the original mercury arc valves in the converter stations have been replaced with thyristor valves. The Gotland link has shown excellent reliability and has operated without interruption for eight years since the switch to thyristor valves. This link has also been converted from monopolar to bipolar.

In the case of the SwePol Link, return cables were chosen as an alternative to electrodes in order to pacify local resistance to the project, particularly around Karlshamn. The environmental issues that were raised during planning of this link may also apply to future installations.

Lower Emissions Benefit the Environment
The power link between Sweden and Poland is the latest example of the growing economic cooperation between the countries bordering the Baltic Sea. The cable, which was taken into commercial service in June 2000, is a step towards the large-scale power distribution partnership that is known as the Baltic Ring.

The new link allows power generation to be stabilized in both countries, where the seasonal and daily variations in demand can differ considerably. The surplus that builds up in the Nordic region during wet years has already been mentioned. In a really cold year it makes financial sense for this region to import electricity from Poland, generated from coal rather than start up a condensing oil-fired power plant or a gas turbine.

Polish imports of electricity via the link will, in turn, reduce environmental impact in that country. The predicted annual net import of 1.7 TWh is expected to reduce emissions from Polish power plants by 170,000 tonnes of sulfur dioxide and 1.7 million tonnes of carbon dioxide, according to calculations by the Swedish power company Vattenfall.

Polish exports of electricity over the link will also reduce environmental impact in the area in the long term. The country's forthcoming admission to the EU will reinforce this, since it will have to introduce power plants that use modern flue-gas emission control technology.

Poland is currently undertaking an extensive program of privatization. This requires that all power generation and electricity distribution be privatized within three years. Following acquisition, investors must guarantee an investment program that involves upgrading generating equipment to meet EU environmental standards. One example of this is acquisition by Vattenfall of combined heat and power (CHP) plants in Warsaw, where the company has committed itself to invest at least US$340 million in environmental improvements over the next ten years.

Cable Company Is Set Up
SwePol Link AB was formed in 1997 to install, own and operate the cable link between Sweden and Poland. It is a power transmission company that will sell electricity transmission services across the link.

A Polish subsidiary was formed in 1998 to handle the local business. On the Swedish side the link will be used primarily by state-owned Vattenfall, although other companies will be able to sign transmission agreements with SwePol Link.

The new link is approximately 250 km long. It runs from Stärnö, just outside Karlshamn in Sweden, past the Danish island of Bornholm, and returns to land at the seaside resort of Ustka on the Baltic coast of Poland.

The Swedish converter station was sited at Stärnö because a 400-kV station and the Swedish main grid are nearby. This avoided having to build new overhead lines that would have marred the Swedish countryside. The Polish converter station is connected to the Polish 400-kV grid at Slupsk, about 12 km from the coast.

The total cost of the link is estimated at about US$250 million and has involved around 2500 man-years of work for ABB, primarily at its plants in Ludvika and Karlskrona. Both stations will be unmanned, although on-call personnel will be able to provide coverage at short notice.

DC Circuit
The land-based power grid is, of course, an AC system. However, for long underwater links DC is the only viable solution on account of the high capacitance of submarine cables. The SwePol Link basically builds on ABB's HVDC rectifier technology, which was first used in 1954. In the meantime, performance has been further improved, losses have been reduced and control methods have been continuously upgraded.

Most cable links are monopolar systems, in which the return current is carried through the ground and the sea. Power is transmitted over a high-voltage cable. It is a common misconception that sea-water carries the return current because of its high conductivity. However, this is not the case; most of the current travels at a considerable depth through the earth. In the case of the SwePol Link the return current is carried by two insulated copper conductors rated at 20 kV. The use of these conductors eliminates the need for environmentally controversial electrodes.

Another way to reduce any negative side effects of electrodes is to use bipolar technology, which becomes financially viable when the capacity exceeds 1000 MW. In this case the current carried by the electrodes and earth is due entirely to the small imbalance that can never be entirely eliminated by the converters.

The high-voltage cable is around 140 mm in diameter, of which the central conductor takes up 53 mm. Instead of being solid, this consists of copper segments to make it more flexible. The segments are shaped individually, then rolled as a unit to achieve an effective copper cross-section in excess of 99 per cent. The rest of the cable consists of various layers of insulation, sealant and armor. The 250-km long cable is made up of four sections which are laid individually and joined by the laying barge.

Visible Parts of the Link
The visible parts of the link are the two converter stations at Stärnö and Slupsk. Located just a small distance from the center of Karlshamn, the Stärnö station is next to an oil-fired power plant that completely dominates the landscape. By siting the tall valve building in a former quarry some 10 meters deep, the station's impact on the skyline is reduced even more. The power cables run 2.3 km from the station to the sea.

At the Polish end, the valve building is a prominent, but by no means ugly, landmark in the flat agricultural countryside. The Slupsk station is just over 20 meters high and is situated about 12 km from the Polish coast.

Both the high-voltage and return cables run underground almost all the way between the stations. On land this required clearing a five-meter wide swathe through the landscape when the cables were being laid. This will soon be hidden, partly thanks to forest replanting. At sea about 85 per cent of the cable could be laid in a trench about one meter deep to avoid damage by trawlers and anchors.

The converter stations cannot only be seen, but heard too. This is because the eddy currents that flow in all power transformers generate noise at a frequency of 100 Hz. Converter stations also produce higher frequency noise that can be irritating to people living nearby. It was clear that special soundproofing would be necessary. Following calculations and measurement of the noise level and noise propagation, the transformers and reactors were enclosed. The filter capacitor cans are equipped with a noise-reducing device.

A Magnetic Field with Minimal Effect on the Surroundings
Whenever electricity is transmitted through a conductor, it generates a magnetic field around it. Since DC is used, the field is of the same type as the earth's natural magnetic field. This is completely different to the AC fields normally produced, for example, around overhead lines.

Measurements have shown that the magnetic field around the cable at a distance of six meters is equal in strength to the earth's natural magnetic field, while at a distance of 60 meters its intensity drops to just one tenth of that field.

The magnetic field resulting from the combination of 1 + 2 cables varies with the depth and relative spacing of the cables. It is not practical to lay the high-voltage cable at the same time as the two return cables, which means that they cannot be laid right next to each other. They also have to be separated because of the heat they generate. In shallow water the HV cable is laid 5-10 meters from the return cables. The resulting magnetic field measured on the surface of the sea is typically 80 per cent of that obtained around a high-voltage cable in a monopolar installation. The equivalent figure at 100 meters depth with 20-40 meters separation is typically 50 per cent.

Further away from the cables there is an even greater percentage reduction in the magnetic field, added to the fact that the absolute value of the magnetic field at this distance is insignificant compared with the earth's magnetic field. Thus, the use of return cables has no major effect on magnetic field strength. And, in any case, modern ships no longer depend on magnetic compasses.

But what are the possible effects on animal life? Experience with previous cable links has shown that they do not affect fish or other marine organisms. Nor do they affect the vital homing ability of eels and salmon. This is especially important since these fish migrate regularly during the course of their lives and it is essential that their sense of direction remain unimpaired.

Back in 1959 a study was carried out to determine how the Gotland cable had affected the marine environment. This was followed by exhaustive studies on the Fenno-Skan link (Sweden-Finland) and the Baltic Cable (Sweden-Germany). The reports were unanimous: marine life is affected neither by the magnetic field nor by any chemical reactions. The facts speak for themselves. Eels continue to find their way to the Baltic Sea, despite having to cross seven cables on the way.

No Chlorine Formation
The originally proposed monopolar solution, which would have used electrodes to transmit the return current undersea, has been replaced by an alternative solution in which return cables form a closed circuit. Any concerns about chlorine formation have therefore been entirely eliminated, since no electrolysis can occur.

The electrodes that would have been used have an anode made of fine titanium mesh and copper cables for the cathode. The following competing reactions take place at the anode:

2 H2O --> 4H+ + O2 (g) + 4e-

2 Cl- --> Cl2 (g) + 2e-

(g) in the above formulae indicates that these elements are in gaseous form.

The amount of chlorine gas generated depends on the temperature, the chloride content of the seawater and the reaction energies. It reacts almost exclusively with water as follows:

Cl2 (g) + H2O --> HClO + Cl- + H+

At low pH the hypochlorous acid that is formed could be ionized, but in seawater it mostly occurs in molecular form. In time it breaks down into its component parts.

There was a suspicion that the chlorine gas and hypochlorous acid that are formed would react with biological material in the vicinity of the electrodes, resulting in the formation of compounds such as polychlorinated hydrocarbons, which include PCBs.

Studies on the Baltic Cable have ruled out this concern. No accumulation of organic chlorine was observed in the surrounding biomass. To put things in the right perspective, it is worth comparing the described process with the common chlorination of drinking water, in which the hypochlorite concentration is at least 100 times higher than the value measured at the anode.

No Corrosion
The return cables used for the SwePol Link eliminate the risk of corrosion, and this would seem to be the only tangible advantage they offer.

DC cable links that use electrodes, do lead to leakage currents in the earth. The return current passing through the earth takes the shortest path. On its route between the electrodes some of the current may pass through long metal objects, such as railway tracks, gas pipes and cable shielding. Electrolytic reactions could occur between this metal and its surroundings, possibly leading to corrosion. During the planning of the SwePol Link a list was therefore made of all the metal objects that could be at risk (Table 2).

Objects that are at risk of corrosion due to leakage currents require some form of active protection, such as sacrificial or cathodic protection.

The return current can also find a route through other power distribution systems that have multiple earth points close to the electrode. This gives rise to a DC component in the AC grid, which can lead to undesirable DC magnetization of transformers. The problem can generally be solved by modifying the grounding of the AC system.

Benefits Versus Cost
Using the described return cables does, of course, have some advantages, among them the reduced magnetic field strength along the cable route and the fact that they cause neither chlorine formation nor corrosion of underground metal objects. And they also allowed a solution that addressed the environmental concerns of various groups of society.

In any final count, however, these benefits have to be measured against the extra cost. In the case of the SwePol Link, for example, they added about 5 per cent to the cost of the project.

References

  1. The making of the Baltic Ring. ABB Review 2/2001, 44-48.
  2. W. Deines: The influence of electric currents on marine fauna. Cigré study committee no 10, 1959.
  3. Anders Liljestrand: Kontrollprogram bottenfauna, bottenflora (Inspection program: bottom flora and fauna). Baltic Cable. Marin Miljöanalys AB, 1999.
  4. Hakan Westerberg: Likströmskablar, alar och biologiska kompasser (DC cables, eels and biological compasses). Fiskeriverkets Kustlaboratorium, 1999.
  5. E. Andrulewicz: Field and laboratory work on the impact of the power transmission line between Poland and Sweden (SwePol link) on the marine environment and the exploitation of living resources of the sea. Sea Fisheries Institute Report, Gdynia, Feb 2001.
Leif Söderberg is with SwedPower AB (leif.soderberg@swedpower.vattenfall.se) and Bernt Abrahamsson is with ABB Power Systems AB, (bernt.abrahamsson@se.abb.com). ET

<< Previous Article Next Article >>

More Articles At The Electricity Today Magazine

Copyright © 2006 The Electricity Forum, Inc. All Rights Reserved

Published by:


215 - 1885 Clements Road, Pickering, Ontario, Canada, L1W 3V4
Tel: (905) 686-1040 Fax: (905) 686-1078 Email: info@electricity-today.com

Home | Editorial Calendar | Advertising Rates | Circulation | Mechanical Specifications | Media Kit | Latest Issue | Issue Archive | Reader Service Inquiry | e-Magazine Advertising Rates The Electricity Forum | Training | Product Showcase | T&D Companies | T&D Products/Services | Generation Companies | Generation Products/Services | Buy Products Online | News | Industry Links | Bookstore